Most contractors find out how the month went when the bookkeeper closes the books — weeks after the jobs that caused it. By then the slow follow-up, the underpriced job, and the invoice that never went out are history you cannot fix. Five metrics, checked the same day each week, tell you whether leads are being worked, estimates are closing, jobs are making money, and cash is coming in — while there is still time to act. For the are-jobs-making-money metric, our free job profit scorecard runs the bid-versus-actual math on your last finished job in about five minutes.

Why Weekly, and Why Only Five

Monthly is too slow for operations. A lead-handling problem costs you work within days, and a margin problem on one job repeats on the next three if nobody catches it. Weekly is the shortest rhythm most small shops can sustain.

Five is a deliberate limit. Track twenty numbers and nobody tracks any of them. These five cover the full run: leads in, estimates out, work sold, work delivered profitably, and cash collected.

One rule before the list: do not chase someone else’s benchmark in week one. Spend the first four weeks establishing your own baseline. Your numbers, trended over time, are more useful than a generic target.

1. Lead Response Time

What it is and how to count it

The time between a new lead arriving — call, form, text, or referral handoff — and a real first contact from your shop. Not an auto-reply. A person reaching out, or at minimum a personal message sent. Track the typical response and, just as important, how many leads got no response at all that week. The unanswered count is usually the more honest number.

Where the data lives

Your CRM if you use one — most log when a lead was created and when it was first touched. If you do not, your phone system and inbox hold the timestamps. For the first month, a simple log with two columns, “lead in” and “first contact,” beats a perfect system nobody updates.

What to do when it slips

Slow response is rarely laziness. It is usually unclear ownership: everyone assumes someone else called back. Name one owner for new leads during business hours and one backup, and define what happens after hours. Fix ownership before you buy automation.

2. Estimate Close Rate

What it is and how to count it

Of the estimates you sent, how many turned into signed work? Count it on a rolling basis — this week’s decisions usually belong to estimates sent weeks earlier, so judge it over several weeks, not day by day. Track it overall first; split by estimator later.

Where the data lives

Wherever estimates are written: your estimating tool, CRM pipeline, or a spreadsheet. The data only exists if every estimate gets marked won or lost. That discipline is worth more than the metric itself, because a pile of “unknown” estimates is also your follow-up list.

What to do when it slips

Separate the two usual causes before reacting. If follow-up is late or missing, that is a process problem. If you are chasing price-sensitive work you should not take, that is a qualification problem. Lowering prices is the last response, not the first.

Worked example: what five points of close rate are worth

Run the math with example numbers. Say you send 20 estimates in a month and close 25% of them: 20 x 0.25 = 5 signed jobs. Lift that close rate to 30% on the exact same 20 estimates – faster follow-up, tighter qualification – and the math is 20 x 0.30 = 6 signed jobs. That one extra job, at an example $6,500 average job size, is $6,500 more booked work from the same lead flow, with no extra marketing spend. Put your own month in the same math – estimates sent x your close rate, then the same volume at five points higher – and the size of the prize tells you whether follow-up or qualification deserves your attention first.

3. Gross Margin by Job

What it is and how to count it

For each completed job: what you billed, minus the direct costs of doing it — labor, materials, subcontractors, permits, and rentals. Divide by what you billed. Do this per job, not just for the company as a whole. A healthy company average can hide three jobs that lost money and two that carried the month.

Where the data lives

Your accounting system — QuickBooks or Xero for most small shops — provided costs are coded to jobs. If labor lives in one app and invoices in another and nothing joins them, that gap is the first fix. A rough per-job tally, done consistently, beats waiting for perfect job costing.

What to do when it slips

Look for the pattern before blaming the crew. Margin leaks repeat — the same underpriced item, scope gap, or callback. Compare estimate to actual on the worst job each week and write down the one reason. That note is your estimating correction list.

4. Days to Invoice, Days to Paid

What it is and how to count it

Two linked delays: how long after work is complete the invoice goes out, and how long after that the payment lands. Track the average for invoices issued that week and keep a simple aging list of what is still unpaid. Cash problems in contracting are often billing problems wearing a disguise — the work is done, the money is earned, and the invoice is sitting in a truck or an inbox.

Where the data lives

Your accounting system holds invoice and payment dates; your job folder holds the completion date. If comparing them takes detective work, start simpler: every completed job invoiced within a set number of days you choose, and check the exceptions weekly.

What to do when it slips

Shorten the first delay first — it is entirely in your control. Same-day invoicing is a process choice, not a software purchase. For the second delay, a consistent, polite follow-up cadence beats an occasional frustrated call.

5. Booked Work Ahead

What it is and how to count it

How much signed work is waiting, expressed in weeks: your backlog of sold work divided by what your crews can typically produce in a week. This is the early-warning number. Close rate tells you about last month’s estimates; booked work ahead tells you whether the schedule empties out three weeks from now — while marketing and sales still have time to respond.

Where the data lives

Your schedule and signed contracts. Build it from the calendar and a list of sold jobs with approximate values and durations. It does not need to be precise — it needs to be updated weekly and believed.

What to do when it slips

If it shrinks two weeks in a row, that is a sales problem arriving early — reopen old estimates and check lead flow before the gap reaches the schedule. If it grows beyond what crews can deliver, have honest conversations about start dates before you sell dates you cannot hit.

The 30-Minute Weekly Rhythm

Pick one fixed slot — Monday morning works for most shops. One person owns pulling the numbers onto the same one-page sheet every week. Review in order: leads, closes, margin, cash, backlog. For anything off trend, agree on one action, one owner, and check it next week. A fancier tool can come later — software amplifies a rhythm, it does not create one.

The Takeaway

You cannot fix what you only learn about at month-end. Five numbers, thirty minutes, same time every week. Establish your baseline first, then improve one leak at a time.